Sectors · Manufacturing

Solar Power for Manufacturers and Factories

Your machines run in daylight, and so does solar. We design and fit solar panels and batteries that cut the cost of powering your production. Every system is built around your roof, your electrics and your shift patterns.

100–1,000+ kWpTypical factory system size (peak power)
DaytimeYou use power when solar makes it
25+ yearsExpected system lifespan
£0 upfrontThrough a solar PPA (you just pay for the power)

Your Challenges, Solved

Built Around How Factories Really Work

Factories bring their own technical and practical challenges. Here’s how we deal with each one.

The challenge

Rising, unpredictable energy bills

Electricity is one of your biggest production costs, and prices are hard to budget for.

→
Our solution

Generate your own daytime power

We size the system from your half-hourly meter readings, so you use most of the power it makes.

The challenge

Production can’t stop

Downtime costs money, and contractors on site can put your people and your work at risk.

→
Our solution

Installs planned around your shifts

Roof work in stages, safety planned under CDM (UK construction safety law) and a short, booked switch-over, out of hours if needed.

The challenge

Older or tricky factory roofs

Steel roofs, fragile rooflights and roof weight limits all need checking before any panels go on.

→
Our solution

Structural and roof surveys first

We check roof strength, fixings and access, then pick the right mounting system for your building.

The challenge

Grid limits and approvals

Bigger systems need approval from your DNO (the company that runs your local network), and some sites can only send a little power back.

→
Our solution

We handle the G99 application

From the application to limiting how much your system sends back, we manage the grid process for you.

The challenge

Insurer and fire safety concerns

Insurers now often ask how rooftop solar has been designed and protected.

→
Our solution

Designed in line with RC62

Fire safety planned from day one, with full paperwork for your insurer.

Moralis solar engineer at a manufacturing facility

Engineers, Not Salespeople

Safety and Engineering Under One Roof

Moralis has solar engineers and its own health and safety and CDM team. So one team is responsible for the design, grid approval, safe install and handover, with all the paperwork your site, insurer and auditors expect.

Our Design & Engineering →

What a Project Looks Like

A Typical Manufacturing Install

Every site is different, but this shows what a typical factory roof project looks like.

Get Your Site Assessed →

Roof typeSteel sheet roof
System size250 – 500 kWp
Grid processG99 application
Install time4 – 8 weeks

A rough guide only. We confirm your system size, timings and savings after a site survey.

FAQs

Manufacturing Solar Questions

Will installation disrupt production?

No. Most work happens on the roof, and we plan access, lifting and the switch-over around your shifts. The final connection usually needs only a short, booked shutdown, out of hours or during planned maintenance.

How do you work out the right system size?

We use your half-hourly meter readings to match the system to how much power you use, so you use most of what it makes. That pays back better than just filling the roof.

What tax relief is available?

HMRC usually treats solar panels like any other business equipment, so you may be able to take the cost off your taxable profits (capital allowances). Your accountant can confirm what applies to you.

Can we go solar without paying upfront?

Yes. With a solar PPA, a funder pays for the system and you buy the power it makes at a lower rate than the grid. Finance and leasing are also available.

Get Started

See What Solar Could Save Your Factory

Book a free site survey and we’ll show you the system size, savings and payback time based on the power you really use.