01

The Brief

Alongside its hotels, the client wanted solar on its headquarters office. Offices suit solar well. They use most of their electricity during the working day, exactly when the panels are generating, so a well-sized system can cover a large share of daytime use.

02

The Challenge

  • Installing on a working office, with staff on site throughout.
  • Designing around the existing roof layout, equipment and access routes.
  • Matching the system size to how the building uses power on weekdays.
  • Getting G99 approval (permission to connect) from Electricity North West.
03

Our Solution

Our team surveyed the building, checked its energy use data and designed a rooftop system of approximately 350 panels to suit its weekday use. We bought the equipment, managed the contractors on site and kept the client updated at every stage.

We handled the G99 application with the local network operator, Electricity North West, so the system could be switched on smoothly.

04

The Result

The headquarters now makes much of its own daytime electricity, cutting its energy bills and carbon emissions. It was the last site in the three-site programme, delivered by our team from first survey to final handover.

Solar that works the same hours as the people inside.
Preston Office · Commercial Rooftop Solar

How We Delivered It

From Survey to Switch-On

1

Survey

Roof, electrics and energy use

2

Design

System sized to demand

3

G99

Grid approval secured

4

Install

Safely, with the building in use

5

Handover

Switched on, with full paperwork

Gallery

On Site in Lancashire

Browse the photos, or tap the main image to view it full screen.

Preston Office installation +
Preston OfficePreston, Lancashire
01 / 12
Project spotlight

Preston Office

Our team surveyed the building, checked its energy use data and designed a rooftop system of approximately 350 panels to suit its weekday use.

LocationPreston, Lancashire
SystemRooftop solar PV, approx. 350 panels
Our roleSurvey, design, buying equipment, managing contractors and grid connection
Start a Similar Project →

Project delivered by the Moralis team in a previous role within the renewable energy industry.

Next project Cheshire Farm 80 kWp · View case study →

Your Project Next

Have a Building Like This?

Book a free site survey and we’ll show you what solar could do for your business.